Q1 Plans Chapter 14 Page 14-2
- Details
- Category: Quickie Plans
- Published: Monday, 12 May 2008 10:28
- Written by Dan Yager
- Hits: 2059
CONTROL STICK INSTALLATION
This section is to be done after the fuselage has been assembled and the side consoles installed.
Begin by installing CS1 in the right hand side console. The forward face of CS1 should be at about STA51.7 Note that two plies of BID are used in a wrap-around configuration to attach CS1 to the RH top side console. In addition, the same procedure should be used to join CS1 to the RH side console. A ply front and back should be used to join CS1 to the fuselage side. Trim glass around hole after cure.
CONTINUED ON NEXT PAGE