Login Form

Hour 63 - Right Longeron

{flv}construction/hour063{/flv}

In this video I simply repeated the steps of my last video on the opposite side of the fuselage. Flattened the corner, mitered the end, cleaned the foam in the front, tapered and rounded, and finally began applying flox to the side of the fuselage.

Aren't things supposed to go a LOT faster the SECOND time you do them?  Laughing

In the next video, I'll finish floxing and clamping the longeron into position permanently!

As always I invite your feedback below, or in the forums