Q1 Plans Chapter 3 Page 3-10
- Details
- Category: Quickie Plans
- Published: Monday, 10 November 2008 00:00
- Written by Dan Yager
- Hits: 7210
Do not start a large layup if tired. Get some rest and do it when fresh. It's best to have three people for any large layup, two laminators and one person to mix epoxy. Be sure the shop is clean before you start.
Take the recommended health precautione (discussed later in detail) using gloves or barrier skin cream. Get your grubby, old clothes on or at least a shop apron. Make sure that your tools are clean from the last layup and ready to use. Your working area should be between 60°F and 90°F. Best results are obtained at 70 to 75°F. Below 70°F the epoxy is thicker making it more difficult to wet the cloth. Above 85°F, the possibility of an exotherm is greater.
Step 2: Cut Fiberglass Cloth
The fine points of glass cutting have been covered on page 3-3. Remember that there isn’t any requirement to cut accurate dimensions. Cloth dimensions are given well oversize. You scissor trim them as you go, while laying the cloth up. It is a good ides to keep two pair of scissors, one clean and in the glass storage area and one in the shop that gets epoxy on it. After cutting, roll or fold the material: keep it clean and handy for the layup.
Step 3: Prepare Surface
The only difference between layups over different materials is in surface preparation. The layup over Foam will be covered here since you will be doing more of it, and other surface preparations will be covered separately.
The foam surface is prepared by leveling uneven areas with a sanding block and brushing or blowing any dust off the surface. Use a compressed air or vacuum to remove dust.
Now is the time to accurately check that the foam core is the correct size, shape and contour. Refer to the section views of the part - be sure your core looks exactly like that on the section view. Lay a 12-inch straightedge spanwise on all critical areas of the flying surfaces (see sketches pg 3-13) and be sure you don’t have any high or low places or joggles. Measure any areas that involve fiberglass buildups to check for correct depth. Build up is 0.009 inch per ply for UNI and 0.013 inch per ply for BID.
Step 4: Mix Epoxy
Mix epoxy when you need it, not before. Micro, dry micro, and flox will be required at various stages of the layup. Mixing and composition details were covered on page 3-5. Apply a coat of micro slurry to the foam surface before the first glass ply is laid over it. The slurry can be poured on the foam and spread thin with a squeegee or it can be brushed on with a brush. Fill any dings or gouges in the foam core with dry micro.
Step 5: Lay on the Cloth
Lay on the cloth in the specified orientation. Pull the edges to straighten the cloth out and to remove wrinkles. Maximum strength and stiffness is obtained if the fibers are not wavy or wrinkled. If the cloth is to be applied around and into a sharp corner, you will find the job easier to do if the fiber orientation is at 45° to the corner. Don’t get depressed if the layup looks like a hopeless mess at this point. Press on with patience and things will work out fine. To remove wrinkles, study the direction of fibers. Follow the fibers to the outeredge of the cloth and pull on the outside edge. Pushing a wrinkle off the part is incorrect. Once the part is free of wrinkles use a squeege and make light passes from the center outwards to smooth the cloth.
Step 6: Wet Out the Cloth
Wet out the cloth by brushing on a thin coat of epoxy. Do not use micro between plies of cloth. This may nut be necessary if there is enough epoxy under the cloth to be brought to the surface. This is done by "strippling," which involves a vertical stabbing motion of a paint brush over the cloth. This brings excess epoxy up from below to wet out the cloth, resulting in a weight savings as compared to adding more epoxy on top. REMEMBER, epoxy adds no strength beyond what is needed to wet out the white color of the cloth and fill air voids; any further addition of epoxy is only dead weight.
Where multiple plies are required, the first plies may be laid up wet and the excess resin brought up by squeegeeing and stippling to help wet out the middle plies. To do this, pour epoxy onto the part and move it around the surface with a squeegee. Your work will go much faster if you make the layup too wet, then remove excess epoxy with many light passes with the squeegee. Do not squeegee too hard, as this can starve the surface of micro and introduce sir. Continue to inspect for air (tiny white flecks or bubbles) and stipple or squeegee in more epoxy to remove the air. A handy squeegee can be cut from the flexible plastic found on a coffee can lid. You may also find a paint roller handy for spreading around the epoxy. Special stipple rollers are available at VariEze distributors. The final plies are ambitiously stippled and additional epoxy is applied sparingly. When in doubt - stipple it out.